Impact of modelling assumptions on time horizon results

Impact of modelling assumptions on time horizon results 图片 1

As METR’s time horizon task suite saturates, the results are becoming more sensitive to analysis choices. One example of this was the recent update to fix a modelling mistake with regularization, which decreased recent models’ 50% time horizon results by up to 20%, but had a smaller impact on earlier LLMs’ 50% time horizons. 1 In this post I’ll: Give a refresher on the current model used to calculate time horizon results and more detail about the regularization mistake METR recently fixed Go over what I see

添加评论
点赞收藏
点踩分享查看原文
评论
?
参与讨论