AgentEx and Cognitive Load

I’ve said it a few times, and I’ll say it again - AgentEx is DevEx. What scales engineering success scales agentic performance. I usually talk about feedback loops, but that’s one part of it. Today I want to talk a little about cognitive load.

Human Cognitive Load Link to heading

Feedback looks are the most important aspect for continuing work, but cognitive load is the most important for beginning work. That is to say, how much work do you have to do to fit a problem in your head? (You should immediately see where I’m going after that sentence).

添加评论
点赞收藏
点踩分享查看原文
评论
?
参与讨论