Level Boarding Soon, Fast, and Cheap
🫧 Open on Bubbles Caltrain is working on their level boarding roadmap. If their recent work on grade separations is anything to go by, the capture of the agency by the layers of consultants belonging to the transit industrial complex is likely to result in a gold-plated mega-project approach to delivering level boarding in the late 2030s, where each station platform must be reconstructed from the ground up at a system-wide cost easily topping $2 billion. We don’t need to let them turn level boarding into an
评论
?
参与讨论