DOE Approves Final Safety Analysis for Oklo’s Groves Isotope Reactor, Startup Imminent

Oklo announced that the U.S. Department of Energy (DOE) has approved the Documented Safety Analysis (DSA) for Oklo Isotopes’ Groves Isotope Test Reactor in Texas under DOE’s Reactor Pilot Program (RPP). The DSA is the facility’s final safety basis grounded on a detailed technical analysis of potential hazards, safety controls, and operating requirements needed to support safe startup. The DSA approval follows DOE’s approval of the Preliminary Documented Safety Analysis (PDSA), which established the facility

添加评论
点赞收藏
点踩分享查看原文
评论
?
参与讨论